Create free accountOpitsat Harbour Electrical Reconstruction The scope of work consists of the furnishing of all plant, labour, equipment, and material for the Opitsat Small Craft Harbour Electrical Reconstruction. The work will be completed in accordance with the specification and accompanying drawings and subject to all terms and conditions of the Contract. The project work will consist of, but will not necessarily be limited to, the following: Phase 1: Service Installation:
Provide new service pole including anchoring & structural engineering services to determine final height and mounting means. Contractor to provide detail drawing stamped by structural engineer to owners representative prior to fabrication. Provide new service disconnect and meter base enclosures Coordinate with BC hydro for the connection of the primary conductors.
Phase 2: Main CDP Installation
Provide structural engineering services for the design of new supports for a new central distribution panel (CDP) at Wharfhead. Contractor to provide detail drawing stamped by structural engineer to owners representative prior to fabrication Provide feeder from service pole at top of approach to CDP at Wharfhead Supply and install new CDP as per drawings.
Phase 3: Distribution cabinets and lighting
Supply and fabricate new light poles and receptacle cabinets identified for the harbour floats. Supply and install new luminaires and light poles along the approach Install new luminaires and receptacle cabinets identified for the harbour floats. Provide wiring on common circuit for all luminaires including those in cabinet canopies to allow for control form single photo controller. Supply and install power feeders to all new electrical equipment on harbour floats.
FAMILIARIZATION WITH SITE Before submitting a bid, bidders can visit the site and its surroundings, at their own expense and schedule, to review and verify the form, nature, and extent of the work, materials needed for the completion of the work, the means of access to the site, severity, exposure and uncertainty of weather, soil conditions, any accommodations they may require, and in general shall obtain all necessary information as to risks, contingencies and other circumstances which may influence or affect their bid. No allowance shall be made subsequently in this connection on account or error or negligence to properly observe and determine the conditions that will apply. Contractors, bidders, or those they invite to site are to review specification section on Health and Safety before visiting site. Take all appropriate safety measures for any visit to site, either before or after acceptance of bid. Bidders that wish to visit the site must send an email to Beverly.shawana@dfo-mpo.gc.ca and provide the following information: a. Business name b. Business address c. Business phone number d. Bidder’s representative name e. Bidder’s representative email address