Create a free account and describe your company. With the trial, CanPursue checks every opportunity against it and explains the fit.
Create free accountCreate a free account to see past contracts like this one: who won and at what price.
Create free accountTitle: Foundation and Tower Replacement – LL1450 Capstan Reef Location: Rainy Lake, Ontario The scope of work consists of the furnishing of all plant, labour, equipment, and material for the Foundation and Tower Replacement at Rainy Lake, Ontario. The work will be completed in strict accordance with the specification and accompanying drawings and subject to all terms and conditions of the Contract. 1.1 Description of Work .1 Work under this Contract includes but is not limited to the provision of all labour, materials, and equipment required to: .1 Mobilize to site with a work barge of appropriate size and certification; .2 Clearing of rubble to expose bedrock. .1 CCG staff will be on site to determine appropriate location for new tower. .3 Install one [1] new concrete pier; .1 Bidder may assume water depth of 0.610 m for bidding purposes. .4 Scheduling of concrete testing by CCG acquired third party firm. .5 Transportation and installation of one [1] new CCG supplied aid to navigation (AtoN) tower; .6 Salvage and return of the existing tower, complete with all appurtenances to CCG Base Parry Sound; .7 Demolish and dispose of existing pier; and .8 Demobilize. .2 The following work will be undertaken by others and is hereby excluded: .1 Supply one [1] ATON tower; .1 Tower is to be transported to site from staging location by contractor. .2 Supply and installation of lantern, battery and solar panel onto new ATON tower. FAMILIARIZATION WITH SITE Before submitting a bid, bidders can visit the site and its surroundings, at their own expense and schedule, to review and verify the form, nature, and extent of the work, materials needed for the completion of the work, the means of access to the site, severity, exposure and uncertainty of weather, soil conditions, any accommodations they may require, and in general shall obtain all necessary information as to risks, contingencies and other circumstances which may influence or affect their bid. No allowance shall be made subsequently in this connection on account or error or negligence to properly observe and determine the conditions that will apply. Contractors, bidders, or those they invite to site are to review specification section on Health and Safety before visiting site. Take all appropriate safety measures for any visit to site, either before or after acceptance of bid. Bidders that wish to visit the site must send an email to Beverly.shawana@dfo-mpo.gc.ca and provide the following information: a. Business name b. Business address c. Business phone number d. Bidder’s representative name e. Bidder’s representative email address
Not stated in the notice: procurement type, procurement method, selection criteria, region of delivery, region of opportunity, expected contract period, end user
No attachments listed in the open data.
No contact listed in the open data.