Create free accountDescription of work SECTION INCLUDES
Title and description of Work. Contractor use of premises. Owner occupancy.
WORK COVERED BY CONTRACT DOCUMENTS
Work of this Contract comprises general construction of Accessibility Upgrades to the Torrent River Fishway Observation Chamber, located at Hawke's Bay, NL and further identified as Newlab Engineering Limited Project # 2017-40. Work included in this Contract generally comprises of minor interior demolition and installation of an inclined wheelchair lift and automatic door operator. Work covered by the contract documents includes Commissioning of the facility including arranging final inspection and certification by Service Nl and engagement of third party structural engineer for verification of equipment structural support. Substantial Completion date is March 31, 2108 requiring utilization of Winter requirements. See Section 01 00 50 - General Instructions, article 1.6.
CONTRACTOR USE OF PREMISES
Contractor has unrestricted use of site. Coordinate use of premises under direction of Owner’s Representative. Obtain and pay for use of additional storage or work areas needed for operations under this Contract. Remove or alter existing work to prevent injury or damage to portions of existing work which remain. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as directed by Owner’s Representative.
RELATED WORK .1 The following specification sections are referenced to indicate work responsibilities as specified and carried in other versions. Section 26 05 00 – Common Work Results – Electrical. on-site DOCUMENTS Maintain at job site documents as indicated in Section 01 31 00 – Project Management and Coordination. CONTRACT DOCUMENTS Legends and schedules in the Issued for Tender Drawings take precedence over the Technical Specifications with respect to products and materials identified.
Not stated in the notice: procurement type, procurement method, selection criteria, region of delivery, region of opportunity, expected contract period, end user
The source reports 2 amendments. CanPursue observed 1 of them with dates.
No attachments listed in the open data.
No contact listed in the open data.