Create a free account and describe your company. With the trial, CanPursue checks every opportunity against it and explains the fit.
Create free accountCreate a free account to see past contracts like this one: who won and at what price.
Create free accountThe work covered under this project consists of all demolition, architectural, structural, mechanical and electrical work to facilitate the installation of new equipment for the Canadian Coast Guard.
The removal of existing mechanical and electrical equipment/systems as indicated on the contract drawings and more particularly, specified herein. The installation of all mechanical and electrical equipment/systems, as indicated on the contract drawings and more particularly, specified herein. The contractor is responsible for the testing of all systems in presence of Coast Guard personnel at delivery and a report of the testing results to be delivered to owner no later than ten (10) working days after completion of all the testing. Testing shall include but not be limited to: Ventilation System Lighting Heating System All alarm points back to alarm cabinet Verification of electrical circuit designations Verification of documentation Physical inspection of equipment shelters
Documentation on the system and subsystem is to be provided by the contractor. This shall include but not limited to: Complete set of as-built drawings. A complete maintenance manual indicating required maintenance for all installed components, schedule and parts list. A complete report on all system testing.
The work included in this contract is specified in the format of general specification document with specific works identified on drawings. The contractor remains responsible for the appropriation of the work between the trade, contractors, his own forces and suppliers. The Engineer will not be responsible for determination of or for providing opinion on the scope of work split between sub-contractors and trade jurisdictions. SITE VISIT: There is no mandatory site visit. But should a Bidder want a voluntary site visit at either of these two sites. Port Caledonia and/or St. Columba, they must send an email to Lynda.Coulombe@dfo-mpo.gc.ca no later than noon (EDT) on Thursday, October 12, 2017 ENQUIRIES DFO will accept Enquiries from Bidders until 2:00 PM Eastern Daylight Time (EDT) on Friday, October 13, 2017. Bidders must send their enquiries by email to Lynda.Coulombe@dfo-mpo.gc.ca. EXPECTED START AND COMPLETION DATES: Start Date: Upon contract Award Completion Date: December 18, 2017
Not stated in the notice: procurement type, procurement method, selection criteria, region of delivery, region of opportunity, expected contract period, end user
No amendments observed.
No attachments listed in the open data.
No contact listed in the open data.