Create a free account and describe your company. With the trial, CanPursue checks every opportunity against it and explains the fit.
Create free accountCreate a free account to see past contracts like this one: who won and at what price.
Create free accountWORK SITE LOCATION Cape St. John, Newfoundland DELIVERABLES / SCOPE OF WORK The work consists of the furnishing of all plant, labour, equipment and material for demolition and removal of various infrastructure and hazardous materials at the Gull Island Light station, Cape St. John, NL, in strict accordance with specifications and accompanying drawings and subject to all terms and conditions of the Contract. In general, work under this contract consists of, but will not necessarily be limited to, the following: 1. Demolition, removal and disposal of the double dwelling. Note that the concrete foundation, including above grade concrete foundation walls associated with the dwelling can remain. Contractor to be prepared to core 150mm diameter core holes in the cistern of the dwelling to prevent future water ponding. For Bidding, assume that 12 core holes through 200mm thick reinforced concrete will be required. The Departmental Representative will provide direction related to the core holes (including specific locations), while in the field. 2. Demolition, removal and disposal of the equipment buildings, boathouse, winch house, hoists, landing areas, tramway and sheds as noted on the drawings. 3. For all concrete foundations to remain, remove flaking/peeling paint down to the bare concrete and dispose of paint chips as hazardous lead waste. This includes exterior foundation walls, interior floor slabs and basement slabs. 4. Removal and disposal of all furniture, equipment, loose materials and debris on both the inside and outside of the building infrastructure, including materials scattered around the site. Do not proceed with any portion of the demolition work until the Departmental Representative has approved the Contractor’s written demolition work plan. FAMILIARIZATION WITH SITE Before submitting a bid, bidders can visit the site and its surroundings to review and verify the form, nature and extent of the work, materials needed for the completion of the work, the means of access to the site, any accommodations they may require, and in general shall obtain all necessary information as to risks, contingencies and other circumstances which may influence or affect their bid or costs to do the work. No allowance shall be made subsequently in this connection on account of error or negligence to properly observe and determine the conditions that will apply. Contractors, bidders, or those they invite to site are to review the specification Section 01 35 29 "Health and Safety Requirements" before visiting site. EXPECTED START AND COMPLETION DATES The services of the Contractor will be commencing upon contract award. The expected completion date of this project is November 30, 2017.
Not stated in the notice: procurement type, procurement method, selection criteria, region of delivery, region of opportunity, expected contract period, end user
No attachments listed in the open data.
No contact listed in the open data.