Create free accountWork under this contract includes, but is not limited to, the provision of all labour, materials, and equipment required to:
Procure surveyor to complete layout; Design, supply and install foundations for two [2] new AtoN (Aid to Navigation) towers using provided geotechnical report and capable of supporting the associated load as determined by the project engineer; Design and construct a culvert style entrance into the site and gravel access-way running to both new AtoN tower locations;
Fabricate two [2] AtoN towers using supplied drawings in Appendix B3; Transport two [2] AtoN towers to the site; Erect the new AtoN towers, including all appurtenances; Pick up day-marks and associated hardware from CCG and install on new towers; Remove to grade and dispose of the existing rear range; Execute close-cut clearing to establish visibility corridor; Restoration as necessary; and, Erect and maintain any and all measures required to complete the works in consideration of the reasonably anticipated weather conditions during the construction period
Installation of lanterns and associated equipment; and, Fabrication of lanterns, day-marks and associated equipment
Not stated in the notice: procurement type, procurement method, selection criteria, region of delivery, region of opportunity, expected contract period, end user
The source reports 3 amendments. CanPursue observed 1 of them with dates.
No attachments listed in the open data.
No contact listed in the open data.