Structural Modifications to the Bay Bulls Warehouse | Fisheries and Oceans Canada · CanPursue
Opportunities
Fit is part of the trial and paid plans.Closed

Structural Modifications to the Bay Bulls Warehouse

Fisheries and Oceans CanadaFP802-160382Federal
Find on CanadaBuysAdd to pipeline
Published
Jan 20, 2017
Respond by
Feb 9, 2017
Latest amendment
—2 amendments

See how this opportunity fits your company

Create a free account and describe your company. With the trial, CanPursue checks every opportunity against it and explains the fit.

Create free account

Who won similar work

Create a free account to see past contracts like this one: who won and at what price.

Create free account

Description

Located at the DFO Small Craft Harbours facility in Bay Bulls, NL, the Bay Bulls Warehouse provides operational storage capacity for DFO Fisheries Management (Conservation and Protection Directorate). The existing warehouse consists of an insulated wood frame structure with approximate dimensions of 12.5m x 12.5m, with a concrete perimeter frost wall and concrete floor slab. DFO require an extension to the existing warehouse to increase storage capacity. As such, a Contractor is required to supply and install all construction materials, labour, consumables and equipment to complete a lean-to style extension to the existing warehouse of approximate 3.0m x 8.5m. Complete details of the scope of work are found in the Technical Specifications and Drawings provided, with a brief summary by discipline provided below: 1. Civil – Earthworks required to prepare ground for placement of frost wall foundation extension and concrete floor slab. 2. Structural – Placement of frost wall foundation extension and floor slab, and installation of timber wall and roof framing. 3. Architectural – Sheathing of building (interior and exterior), installation of siding, fascia, soffit, roof shingles, sealing of all penetrations. 4. Electrical – Installation of new interior lighting (fed from the existing electrical breaker panel in the warehouse). The following have been identified as key issues that will need to be considered during the execution of this project: - All temporary supports required to complete the warehouse extension are the responsibility of the Contractor. The Contractor is to supply a detailed plan of the temporary supports for approval by the Owner’s representative prior to installation. - The area at the rear of the building will be cleared of storage materials prior to the start of the project. However, the Contractor is responsible for ensuring that the items remaining in the Warehouse that are owned by DFO are secured and protected from the elements for the duration of the project. - Any hoarding, temporary barriers, signage, and security measures are the responsibility of the Contractor for the duration of the project. - This work is targeted to be completed during the 2017 winter season. All heating equipment and materials required to achieve proper ground preparation and to allow for the placement of concrete is the responsibility of the Contractor. Site Visit: A non-mandatory site viewing will be scheduled for Tuesday, January 31st, 2017 at 2 pm. Contractors wishing to visit the site must contact the Contracting Authority via email to confirm attendance and obtain further information/schedule. Before submitting a bid, bidders can visit the site and its surroundings, at their own expense, to review and verify the form, nature, and extent of the work, materials needed for the completion of the work, the means of access to the site, severity, exposure, and uncertainty of weather, soil conditions, any accommodations they may require, and in general shall obtain all necessary information as to risks, contingencies, and other circumstances which may influence or affect their bid. No allowance shall be made subsequently in this connection on account or error or negligence to properly observe and determine the conditions that will apply.

Procurement

Category
Construction
Jurisdiction
Federal

Not stated in the notice: procurement type, procurement method, selection criteria, region of delivery, region of opportunity, expected contract period, end user

Requirements and qualifications

Supply arrangement
Not stated in the public notice
Security requirement
Not stated in the public notice
Trade agreements
—
Limited tendering reason
—

Classification

GSIN
—
UNSPSC
—

Amendments

The source reports 2 amendments. CanPursue observed 1 of them with dates.

  • Amendment 2Feb 8, 2017
  • Original noticeJan 20, 2017

Documents

No attachments listed in the open data.

Contact

No contact listed in the open data.

Related

More from this buyer

  • Request for Supply Arrangement for Charter VesselsDec 31

Linked contracts

No related records observed.

Source

Find on CanadaBuys

CanPursue has no direct link to this notice. This opens a CanadaBuys search for its solicitation number.

Source
CanadaBuys
Solicitation
FP802-160382
Observed
Sep 18, 2026

The amount, value range and contract duration shown on some CanadaBuys pages are not in the open data, so CanPursue does not show them.

Never miss an amendment

Track this opportunity in your pipeline and watchlists with a free account.

Create free account