Create free accountDELIVERABLES / SCOPE OF WORK The scope of work consists of the furnishing of all plant, labour, equipment, and material for shoreline protection repairs at Southern Harbour Bests Cove, NL. The work will be completed in strict accordance with the specification and accompanying drawings, and subject to all terms and conditions of the Contract. The project work will consist of, but will not necessarily be limited to, the following:
Construction of a new electrical shed complete with concrete foundation; Relocation of signs, as noted on the drawings; Supply and installation of electrical pull pits, asphalt and granulars, as noted on the drawings; and Supply and installation of all electrical work for a complete installation, as noted on the drawings. Note that existing items to be re-used in the new work are shown on the drawings.
FAMILIARIZATION WITH SITE Before submitting a bid, bidders can visit the site and its surroundings, at their own expense, to review and verify the form, nature, and extent of the work, materials needed for the completion of the work, the means of access to the site, severity, exposure and uncertainty of weather, soil conditions, any accommodations they may require, and in general shall obtain all necessary information as to risks, contingencies and other circumstances which may influence or affect their bid. No allowance shall be made subsequently in this connection on account or error or negligence to properly observe and determine the conditions that will apply. Contractors, bidders, or those they invite to site are to review specification Section 01 35 29.06 – Health and Safety Requirements before visiting site. Take all appropriate safety measures for any visit to site, either before or after acceptance of bid. Expected Start and Completion Dates The services of the Contractor will be commencing upon award of the contract. The expected completion date of this project is November 4th, 2016.
Not stated in the notice: procurement type, procurement method, selection criteria, region of delivery, region of opportunity, expected contract period, end user
The source reports 3 amendments. CanPursue observed 1 of them with dates.
No attachments listed in the open data.
No contact listed in the open data.