Create a free account and describe your company. With the trial, CanPursue checks every opportunity against it and explains the fit.
Create free accountCreate a free account to see past contracts like this one: who won and at what price.
Create free accountMarginal Wharf Reconstruction – Burgeo, NL
Supply all plant, labour, materials, and equipment for marginal wharf reconstruction at the existing DFO (SCH) wharf facilities at Burgeo, NL as per the plans and specification.
The scope of work consists of the furnishing of all plant, labour, equipment, and material for marginal wharf reconstruction at the existing wharf facilities at Burgeo, in strict accordance with the specification and accompanying drawings, and subject to all terms and conditions of the Contract.
The project work will consist of, but will not necessarily be limited to, the following: ? Demolition, removal, and disposal of the existing treated timber cribwork marginal wharf and asphalt approach. All demolished and excavated materials to be disposed of at an approved waste disposal site. ? Construction of a new treated timber step cribwork marginal wharf, complete with reinforced concrete deck to the dimensions as indicated on the drawings. ? Supply and installation of structural timber including treated timber coping, wheelguard, wheelguard blocking, and untreated hardwood fender system and ladders. ? Supply and installation of Type “B1” mooring cleats and mooring rings. ? Supply and installation of timber utility pole and empty PVC electrical conduits for future electrical shore power and area site lighting. ? New asphalt pavement approach, including granular fill base and sub-base.
FAMILIARIZATION WITH SITE
Before submitting a bid, it is recommended that bidders visit the site and its surroundings to review and verify the form, nature, and extent of the work, materials needed for the completion of the work, the means of access to the site, severity, exposure and uncertainty of weather, soil conditions, any accommodations they may require, and in general shall obtain all necessary information as to risks, contingencies and other circumstances which may influence or affect their bid. No allowance shall be made subsequently in this connection on account or error or negligence to properly observe and determine the conditions that will apply.
Contractors, bidders, or those they invite to site are to review specification Section 01 35 28 – Health and Safety Requirements before visiting site. Take all appropriate safety measures for any visit to site, either before or after acceptance of bid. Obtain prior permission from the Departmental Representative before carrying out such site inspection.
Not stated in the notice: procurement type, procurement method, selection criteria, region of delivery, region of opportunity, expected contract period, end user
No attachments listed in the open data.
No contact listed in the open data.