Inspection/Leak Testing & Maintenance/Repair of Air Conditioning and Ventilation Equipment in Goose Bay and Fox Harbour, NL | Fisheries and Oceans Canada · CanPursue
Opportunities
Fit is part of the trial and paid plans.Closed

Inspection/Leak Testing & Maintenance/Repair of Air Conditioning and Ventilation Equipment in Goose Bay and Fox Harbour, NL

Fisheries and Oceans CanadaF5211-170174Federal
Find on CanadaBuysAdd to pipeline
Published
Nov 22, 2017
Respond by
Jan 4, 2018
Latest amendment
None

See how this opportunity fits your company

Create a free account and describe your company. With the trial, CanPursue checks every opportunity against it and explains the fit.

Create free account

Who won similar work

Create a free account to see past contracts like this one: who won and at what price.

Create free account

Description

Scope of Work The work will consist of three (3) distinct portions of work: Portion 1 1.1 The work is the bi-annual inspection and leak testing, two (2) inspections per year for the item covered in the Large Cooling Equipment > 5.4 Refrigeration Tons (RT) Capacity section of the Halocarbon Inventory as outlined in Section E for each of the facilities outlined in Section A, Part 3 are to be completed. 1.2 The contractor must provide all necessary labour, materials, tools and equipment to carry out the Bi-Annual Inspections/Leak Testing on the equipment as per the corresponding Halocarbon Inventory located in Section E. Portion 2 1.1 The work is the annual inspection of each of the items covered in the Mid-range Cooling Equipment < 5.4 Refrigeration Tons (RT) and Small-range Cooling Equipment <5 Refrigeration Tons (RT) Capacity section of the Halocarbon Inventory as outlined in Section E for each of the facilities outlined in Section A, Part 3. 1.2 The contractor must provide all necessary labour, materials, tools and equipment to carry out the Bi-Annual Inspections/Leak Testing on the various equipment as per the corresponding Halocarbon Inventory located in Section E. Portion 3 1.1 The contractor must perform Repair and Maintenance when required of the all of the items as per the corresponding Halocarbon Inventory located in Section E for each of the facilities outlined in Section A, Part 3. NOTE:  Halocarbon Inventory attached in Section E must be used as reference guide only. 2. Contractors Responsibilities: 2.1 The contractor must perform any necessary repairs and/or maintenance of all components as outlined in this specification on an as required basis. 2.2 The contractor must connect to the Energy Management and Control System now installed in some units. If any additional installation of the Energy Management and Control System is required by the Department on existing units, the installation will be considered extra to this contract and the responsibility of the Department. 2.3 The contractor’s employees are to familiarize themselves with the facilities in order to carry out work without the assistance of the FM (Facilities Manager/Technical Authority). 2.4 The contractor and all its employees must familiarize themselves with, and adhere to the Contractor Awareness document located in Section D, which forms part of the departmental Procedure for the Management of Halocarbons. 2.5 The procedure above will be provided to the contractor as a hard copy, and as an electronic copy for reference upon contract award. The procedure provides references to the requirements of the Canadian Environmental Protection Act (CEPA), Federal Halocarbon Regulations (FHR), 2003. 2.6 The contractor must complete all required documentation as per CEPA, FHR, 2003. http://laws-lois.justice.gc.ca/eng/regulations/SOR-2003-289/index.html 2.7 The contractor must submit an electronic report via email in Microsoft Word format on the Bi-Annual inspection/leak testing results/findings. This will identify the work required along with a cost estimate for any possible repairs. 2.8 The contractor must supply all parts and labor, for the duration of the contract with the exception of: All fan motors over ½ horsepower Compressors Evaporator Coils If the above listed equipment requires replacement, it will be the responsibility of the Department. 3. Areas of Work (Labrador) Fox Harbour St. Lewis, NL Goose Bay MCTS, NL

These buildings will be occupied. Work must progress with minimal impact on the operation of these buildings. The down time of systems affected are to be kept to a minimum of three (3) days and coordinated with the FM in advance.

Procurement

Category
Construction, Services
Jurisdiction
Federal

Not stated in the notice: procurement type, procurement method, selection criteria, region of delivery, region of opportunity, expected contract period, end user

Requirements and qualifications

Supply arrangement
Not stated in the public notice
Security requirement
Not stated in the public notice
Trade agreements
—
Limited tendering reason
—

Classification

GSIN
—
UNSPSC
—

Amendments

No amendments observed.

Documents

No attachments listed in the open data.

Contact

No contact listed in the open data.

Related

More from this buyer

  • Request for Supply Arrangement for Charter VesselsDec 31

Linked contracts

No related records observed.

Source

Find on CanadaBuys

CanPursue has no direct link to this notice. This opens a CanadaBuys search for its solicitation number.

Source
CanadaBuys
Solicitation
F5211-170174
Observed
Sep 18, 2026

The amount, value range and contract duration shown on some CanadaBuys pages are not in the open data, so CanPursue does not show them.

Never miss an amendment

Track this opportunity in your pipeline and watchlists with a free account.

Create free account