Create free account1.1 Title Standing Offer for Placing, Lifting/Removal, Maintaining and the Servicing of Buoys in the North Atlantic Region – Newfoundland 1.2 Standing Offer Period April 1, 2016 through to March 31, 2018 with the possibility of two (2) additional one (1) year option periods, at the discretion of Fisheries and Oceans Canada Standing offers are not a guarantee of business and Fisheries and Oceans Canada is not obligated to use these services. 1.3 Introduction DFO’s Canadian Coast Guard sector requires services related to the provision of placing, maintaining and lifting buoys through local contractors. 1.4 Objectives of the Requirement The Canadian Coast Guard, Marine Navigation Services establishes aids to navigation that assist vessels to navigate safely through our waterways. The program benefits pleasure craft, fishing and commercial vessels, and ensures the public's right to navigate. Canadian Coast Guard (CCG) Marine Services (MS) is mandated to keep waters accessible by providing aids to navigation, developing waterways, and protecting navigable waters. The Canadian Coast Guard is contracting out for the provision of placing, lifting/removal; maintaining and servicing of the following buoys as per the attached documents. General Description of the Work:
Contractor is required to provide their own vessel to complete this requirement Place buoys on position in accordance with navigational requirements using DGPS when required (seasonal or year-round); Maintain position and operation; Change lanterns as required Lift/remove/change buoys as required.
2.0 Requirements Tasks, Activities, Deliverables and Milestones Upon award of call-up (contract) the contractor is required to inspect all buoys and equipment listed in the Schedule of Rates reporting any discrepancies/defects to the Project Authority. Following initial inspection, the Contractor shall respond to all discrepancies/outages regarding buoys once notified of the outage and report plan to respond to the Aids to Navigation Operation Office/Project Authority. The Contractor shall inspect all buoys after periods of abnormally bad weather, ice conditions, etc., if the Contractor has reason to believe the buoys in his/her area may have been adversely affected, to determine that they are in their correct positions and that the lights etc. are functioning. Buoy positions shall be checked using the methods provided on the Buoy Data Sheets. The Contractor shall change components as necessary to maintain the operation of the lights and buoys including removing old and replacing new components such as lanterns, moorings and reflective material. Should a buoy be removed from a contract area permanently an amendment will be issued to the contractor reducing the amount of the call-up.Likewise, should a buoy be added to a contract area an amendment will be issued increasing the amount of the call-up.Amounts will be based on bids submitted by the contractors.
Not stated in the notice: procurement type, procurement method, selection criteria, region of delivery, region of opportunity, expected contract period, end user
The source reports 2 amendments. CanPursue observed 1 of them with dates.
No attachments listed in the open data.
No contact listed in the open data.