Create a free account and describe your company. With the trial, CanPursue checks every opportunity against it and explains the fit.
Create free accountCreate a free account to see past contracts like this one: who won and at what price.
Create free accountTrade Agreement: WTO-AGP/NAFTA/AIT/Canada FTAs with Peru/Colombia/Panama Tendering Procedures: All interested suppliers may submit a bid Competitive Procurement Strategy: Comprehensive Land Claim Agreement: No Nature of Requirements:
RUBBER FENDER - CCGS Samuel Risley
F2599-155122/A Burns, Robert Telephone No. - (819) 956-1199 Fax No. - (819) 956-0897
Line 1, Rubber Fender Material for CCGS Samuel Risley
The Contractor shall supply and deliver six (6) black coloured fenders, where each fender shall have a length of six (6) meters, composed of extruded Ethylene Propylene Monomer (EPDM) rubber fenders (or equivalent) to the Canadian Coast Guard in Parry Sound, Ontario.
Details: Square O-Bore Fender / R300 marine Fender 300mm x 300mm x 150mm bore Weight is 93 kilograms per meter Edges of fenders rounded No mounting holes or hardware included.
The Contractor must provide proof that the material supplied meets or exceeds the following performance parameters:
Energy absorption at 40% Deflection - 6.3 tonne-Meters Reaction Force at 40% Deflection - 161 Tonnes 70 Durometer Tensile Strength - 2000 psi 5 Elongation - 300 Load Deflection - ASTM D-575 Method A - (Z1)20% Deflection, Maximum 300 psi.
Fender Instructions
a. mounting instructions including the specific instructions for the drilling of bolt holes that will minimize damage tothe fender during the drilling process.
b. specify the minimum distance to the edge of the rubber fender that is permissible to drill bolt holes.
c. instructions that detail the best method to cut the rubber fender material to size.
Delivery Date: Above-mentioned
The Crown retains the right to negotiate with suppliers on any procurement.
Documents may be submitted in either official language of Canada.
Not stated in the notice: procurement type, procurement method, selection criteria, region of delivery, region of opportunity, expected contract period, end user
No amendments observed.
No attachments listed in the open data.
No contact listed in the open data.