CanPursue

Research

  • Search
  • Opportunities
  • Buyers
  • Suppliers
  • Contracts
  • Awards

Intelligence

  • OverviewAccount required
  • WatchlistsAccount required
  • PipelineAccount required
  • IntelligenceAccount required
Create free account

Sign in

⌘K
ENFR
Rock Bay Remediation Proj. Stage 3 | Public Works and Government Services Canada · CanPursue
Opportunities
Fit is part of the trial and paid plans.Closed

Rock Bay Remediation Proj. Stage 3

Public Works and Government Services CanadaEZ899-142200/AFederal
Find on CanadaBuysAdd to pipeline
Published
Jan 15, 2014
Respond by
Mar 10, 2014
Latest amendment
—3 amendments

See how this opportunity fits your company

Create a free account and describe your company. With the trial, CanPursue checks every opportunity against it and explains the fit.

Create free account

Who won similar work

Create a free account to see past contracts like this one: who won and at what price.

Create free account

Description

Trade Agreement: NAFTA/AIT/Canada FTAs with Peru/Colombia/Panama Tendering Procedures: Attachment: YES (MERX) Electronic Competitive Procurement Strategy: Best Overall Proposal Comprehensive Land Claim Agreement: No Nature of Requirements: Solicitation No: EZ899-142200/A Contracting Authority: Liu, Patty Telephone No. - (604) 775-6227 Fax No. - (604) 775-6633

Title

Rock Bay Remediation Project Stage 3

Location

Victoria, BC

Work Description

Public Works and Government Services Canada (PWGSC) is inviting qualified Turnkey (Design-Build) Proponents to remediate the Rock Bay Site at Victoria, BC.

The objective of this Request For Proposal (RFP) is to retain an individual Contractor or Joint Venture to provide the complete design-build (turnkey) work for the remediation of soil groundwater, and sediment at the Rock Bay Site. Utilizing a turnkey service deliver methodology, a full range of professional consultant and contractor services will be required during both the design and construction phases of the project. The work consists of but is not limited to the design and construction of the excavation and associated cofferdam and shoring support, including transport and treatment and disposal of excavated material, backfilling, and outfall diversion. The work requires design and execution for multiple disciplines, and will require detailed project management, including monthly cash flow and detailed forecasting.

Mandatory Proponent's Conference and Mandatory Site Visit

The proponent's conference and site visit for this project is MANDATORY. The representative(s) of the Proponent will be required to sign the attendance sheet at the proponent's conference and site visit. Proposals submitted by Proponents who have not signed the attendance sheet for the proponent's conference and site visit will not be accepted.

The Proponent and/or representative of the Proponent must attend the proponent's conference. The proponent's conference will be held at the PWGSC Victoria Office Boardroom, Room 402, 1230 Government Street, Victoria, BC on January 22, 2014. The conference will begin at 0900 PST. The scope of the requirement outlined in the RFP will be reviewed during the conference and questions will be answered.

Proponent and/or a representative of the Proponent must visit the work site. Arrangements have been made for the site visit to be held on January 22, 2014 1300 PST at the Rock Bay Site. Interested Proponents will be provided with instructions on how to get to the Rock Bay Site at the Proponent's conference.

Proponents are responsible for making their own travel arrangements.

Proponents should wear personal protective equipment (such as: hardhat, high visibility vest, work boots) to the mandatory site visit.

Proponents are requested to communicate with the Contracting Authority before the conference and site visit to confirm attendance. Proponents should provide, in writing, to the Contracting Authority, the names of the person(s) who will be attending and a list of issues they wish to table at least three (3) working days before the scheduled conference and site visit.

Any clarifications or changes to the RFP resulting from the mandatory proponent's conference and site visit will be included as an amendment/addendum to the RFP. Submissions provided by Proponents who did not attend will be excluded from the RFP process.

Interested contractors, please contact the Contracting Authority, Patty Liu (604) 775-6227 or patty.liu@pwgsc.gc.ca prior to the conference and site visit.

Overview of Selection Procedure

The proposal submission itself shall be comprised of two parts, Part 1 - Technical Component and Part 2 - Price Component.

Part 1: Technical Component - Must contain all the material necessary to fully represent the technical content of the proposal called for in the RFP document in a concise, comprehensive manner.

Part 2: Price Component - Contains the price proposal to perform all the proposed services.

Determination of Successful Proposal

To be considered responsive, a submission must: (a) Comply with all of the requirements of the RFP (b) Meet all of the mandatory requirements of the RFP; and (c) Obtain the required minimum of 70 points for the Evaluation Criteria specified in this RFP, which are subject to point rating. The technical rating is performed on a scale of 100 points.

Proponents not meeting (a) or (b) or (c) above will be declared non-responsive.

Price Evaluation

Price Proposal envelopes corresponding to responsive proposals which have achieved the minimum pass mark of seventy (70) points are opened upon completion of the technical evaluation. The sum of all price proposals is divided by the number of proposals to determine an average price.

Total Score

The total overall score (Total Score) assigned to each Proponent's complete proposal is calculated as the aggregate of:

(1) the Technical Score (40%) and; (2) the Price Score (60%).

The Proponent receiving the highest Total Score will be recommended for contract award.

Delivery

Mobilization must occur no earlier than: April 1, 2014 Cofferdam Installation must start no earlier than: July 1, 2014 In water work must occur as per schedule requirements of the Fisheries Permit Site work must reach final completion no later than November 30, 2015 Treatment work must reach final completion no later than January 30, 2016 All work must reach final completion no later than February 15, 2016.

Canada's Trade Agreements

This procurement is subject to the provisions of the Agreement on Internal Trade (AIT), the Canada-Chile Free Trade Agreement (CCFTA), and the Canada-Columbia Free Trade Agreement.

In accordance with Annex 1001.1b-3 Section B - Excluded Coverage Schedule of Canada, this requirement is exempt from NAFTA.

In accordance with Appendix 1, Annex 5 Canada Construction Services, this requirement is exempt from WTO-AGP.

Value of Project

Estimated cost is expected to be between $30,000,000.00 and $35,000,000.00, excluding applicable taxes.

Enquiries

Patty Liu, Supply Specialist Tel: (604) 775-6227 Fax: (604) 775-6633 Email: patty.liu@pwgsc.gc.ca

Firms intending to submit proposals on this project should obtain tender (solicitation) documents through Buyandsell.gc.ca/tenders. Addenda, when issued will be available from Buyandsell.gc.ca/tenders. Firms that elect to base their proposals on tender (solicitation) documents obtained from other sources do so at their own risk and will be solely responsible to inform the tender calling authority of their intention to bid.

This procurement office provides procurement services to the public in English. Delivery Date: Above-mentioned

The Crown retains the right to negotiate with suppliers on any procurement.

Documents may be submitted in either official language of Canada.

Procurement

Category
Services
Jurisdiction
Federal

Not stated in the notice: procurement type, procurement method, selection criteria, region of delivery, region of opportunity, expected contract period, end user

Requirements and qualifications

Supply arrangement
Not stated in the public notice
Security requirement
Not stated in the public notice
Trade agreements
—
Limited tendering reason
—

Classification

GSIN
—
UNSPSC
—

Amendments

The source reports 3 amendments. CanPursue observed 1 of them with dates.

  • Amendment 3Mar 4, 2014
  • Original noticeJan 15, 2014

Documents

No attachments listed in the open data.

Contact

No contact listed in the open data.

Related

More from this buyer

  • High Density Mobile ShelvingDec 15
  • Accommodations - Temecula, CaliforniaMar 31
  • Accommodations - Borrego Springs, CaliforniaMar 31
  • Medium/Large Vessel Recycling ServicesMar 30
  • Furniture for Work SpacesApr 23

Linked contracts

No related records observed.

Source

Find on CanadaBuys

CanPursue has no direct link to this notice. This opens a CanadaBuys search for its solicitation number.

Source
CanadaBuys
Solicitation
EZ899-142200/A
Observed
Sep 18, 2026

The amount, value range and contract duration shown on some CanadaBuys pages are not in the open data, so CanPursue does not show them.

Never miss an amendment

Track this opportunity in your pipeline and watchlists with a free account.

Create free account