Create a free account and describe your company. With the trial, CanPursue checks every opportunity against it and explains the fit.
Create free accountCreate a free account to see past contracts like this one: who won and at what price.
Create free accountTrade Agreement: Agreement on Internal Trade (AIT) Tendering Procedures: All interested suppliers may submit a bid Attachment: YES (MERX) Electronic Competitive Procurement Strategy: Lowest/Lower Bid Comprehensive Land Claim Agreement: No Nature of Requirements: Gun Range, Decommission, J Division
EC373-151419/A Sears, Nathalie Telephone No. - (506) 227-7915 ( ) Fax No. - (506) 636-4376
Work under this contract includes, but is not limited to, the supply and installation of material, and commissioning of the work described below:
1. Lead Abatement: A lead abatement program to decontaminate the firing range facility and associated mechanical, electrical and drainage systems is included in this tender package. Consultant will also do air quality sampling and swab sampling to verify lead levels during the course of construction.
2. Architectural: Work under the architectural consist mainly to remove existing wood door, ceiling tile, wooden floor, bullet trap system, shooting range equipment, construction of temporary walls, etc. Refer to drawing A1 for more detail on architectural scope of work.
3. Electrical: Electrical work consists mainly of dismantling all electrical equipment that were exposed to lead (including cable and devices) and installing new electrical components such as lights, baseboard heaters, receptacles, emergency battery pack, etc. Refer to electrical drawings for more information.
4. Mechanical: Mechanical work consists mainly of removing the ventilation system that was used for the firing range and replacing it with one HRV to supply ventilation to new storage area. Other work consist of installing new sprinkler head in the new storage area and to remove the glycol supply pipe as per mechanical plans. Refer to mechanical drawings for more information. Delivery Date: Above-mentioned
The Crown retains the right to negotiate with suppliers on any procurement.
Documents may be submitted in either official language of Canada.
Not stated in the notice: procurement type, procurement method, selection criteria, region of delivery, region of opportunity, expected contract period, end user
No amendments observed.
No attachments listed in the open data.
No contact listed in the open data.