CanPursue

Research

  • Search
  • Opportunities
  • Buyers
  • Suppliers
  • Contracts
  • Awards

Intelligence

  • OverviewAccount required
  • WatchlistsAccount required
  • PipelineAccount required
  • IntelligenceAccount required
Create free account

Sign in

⌘K
ENFR
Regulatory Guidance on Replacement Steam Generators - An Experimental Study of the Effects of Flat Bar Supports on Streamwise Fluidelastic Instability in Nuclear Steam Generators (R682.1) | Canadian Nuclear Safety Commission · CanPursue
Opportunities
Fit is part of the trial and paid plans.Closed

Regulatory Guidance on Replacement Steam Generators - An Experimental Study of the Effects of Flat Bar Supports on Streamwise Fluidelastic Instability in Nuclear Steam Generators (R682.1)

Canadian Nuclear Safety Commission87055-17-0055Federal
Find on CanadaBuysAdd to pipeline
Published
Jul 3, 2017
Respond by
Aug 14, 2017
Latest amendment
None

See how this opportunity fits your company

Create a free account and describe your company. With the trial, CanPursue checks every opportunity against it and explains the fit.

Create free account

Who won similar work

Create a free account to see past contracts like this one: who won and at what price.

Create free account

Description

1.0 Background Flow-induced vibrations of tubes in steam generator U-bends can lead to a loss of tube integrity due to fretting wear at the tube supports and/or from tube-to-tube impacting. Since these tubes represent the pressure boundary between the irradiated primary side coolant and the secondary side flows, their failure constitutes a breach of containment, and therefore such tube leaks cannot be tolerated. Until the recent operating experience of steam generator tube degradation at San Onofre Nuclear Power Plant, streamwise (or more frequently referred to as in-plane) fluid-elastic instability (FEI) was considered not to be a problem. Indeed, the ASME and JSME Codes do not require consideration of streamwise FEI. While design guidelines against such damaging vibrations are in place, tubes failures still occur and the danger increases as the time in service of steam generators grows longer, and when replacement steam generators do not precisely replicate the original designs. The steam generator (SG) design guidelines are based largely on empirical data from laboratory experiments and design code verification is strongly dependent on service experience. Thus, when new or replacement steam generators (RSGs) are designed, any departure in design from previously proven hardware creates risk. The best proof of this is the permanent shutdown of the San Onofre Nuclear Generating Station (SONGS) in 2012 after operating brand new replacement steam generators for only two years. In fact, one of the units developed large numbers of tube failures after only 11 months of service. These new SGs replaced the original steam generators which had given about 25 years of service. The failures were due to tube-to-tube impacting from in-plane fluid-elastic instability in the U-bends, something which had never before been seen in steam generators in service. Indeed, the current practice was to ignore this as a possible failure mode. The failure of RSGs resulted in a disaster for the nuclear industry and, numerous critiques from the Office of Inspector General pointed to US Nuclear Regulatory Commission (US NRC). Neither Southern California Edison, as the plant operator, nor the US NRC, as the national regulator, saw the risk associated with the RSG design and operation. It is clear that the current design guidelines are inadequate to deal with advanced designs which specify hardware which is beyond our operating experience. Independent research study is required to address needs of a national regulator and to improve our understanding of the effects of such parameters as tube pattern and pitch ratio, tube-to-support clearances and void fraction on tube response to flow-induced vibrations.

2.0 Objectives CANDU utilities are in process of replacing aging steam generators (48 replacement steam generators to be design, manufactured and installed by 2028. The replacement steam generators differ from the original steam generators already licensed. The purpose of this project is to develop this required knowledge and to provide essential information for ensuring that the CNSC staff can make informed assessments of vendor’s designs. The key deliverable of the research project is a guide for a regulatory assessment of the design and operation of replacement steam generators for CANDU reactors.  3.0 Scope of Work The proponent must develop modelling and complete an experimental laboratory study of flow-induced vibrations of tubes in a scaled sectional model of a CANDU type nuclear steam generator under conditions in which the current understanding and available data for design and evaluation is inadequate. Steam-water or a suitable refrigerant must be used to achieve two-phase flow conditions rather than an air-water mixture. Particular attention should be paid to consider the situations of high void fractions (around 90%) in which service failures generally occur. Tube failures in steam generator service may occur in the regions of the U-bends where the void fraction is highest and therefore, the velocities are the highest and the tube damping is least. It is these areas which have not been studied adequately, especially with regard to stream-wise fluid-elastic instability. Extensive measurements must be performed to determine tube response, stability and damping as a function of mass flux and void fraction. Experiments must be carried out to study the effect of flat bar supports on both transverse and streamwise stability of the tubes, including the effects of tube-to-support clearance. CNSC staff are aware that such experiments conducted in two phase flows at very high void fractions could be challenging. 4.0 Tasks to be Performed

Literature survey and review of existing knowledge in the area of stream-wise vibrations in steam generators and heat exchangers.  Review operating experience with replacement steam generators already in operation along with design changes made with RSG vs original SG design.   Identify critical flow and structural parameters of importance for initiation and propagation of streamwise vibrations  Identify most vulnerable array geometry for initiation of streamwise vibrations and critical parameters (tube pitch, array geometry, circulation ratio, tube support clearances, void fraction, …)  Develop structural scaling from CANDU steam generator to experimental test bundle  Propose preliminary design for experimental setup

Develop instrumentation to measure critical parameters, tube frequency response, damping ratio, tube rms amplitude response, and thermal hydraulics parameters 4.8 Define experimental test matrices 4.9 Propose model for streamwise flow induced vibration 4.10 Perform benchmark experiments with data for tube response, stability threshold and damping for a range of void fraction from 60% to about 95%

Analyse experimental results and model predictions to validate model. Re-evaluate test plan if necessary. Perform experiments to study effects of flat bar supports on stability. Quantify the effect of flat bar supports with specified clearance Perform set of experiments on the effect of clearance on stability

Prepare report with complete experimental results, analysis, and implications for steam generator design. Develop guidelines for regulatory assessment of design and performance of replacement steam generators.

Procurement

Category
Services
Jurisdiction
Federal

Not stated in the notice: procurement type, procurement method, selection criteria, region of delivery, region of opportunity, expected contract period, end user

Requirements and qualifications

Supply arrangement
Not stated in the public notice
Security requirement
Not stated in the public notice
Trade agreements
—
Limited tendering reason
—

Classification

GSIN
—
UNSPSC
—

Amendments

No amendments observed.

Documents

No attachments listed in the open data.

Contact

No contact listed in the open data.

Related

More from this buyer

No related records observed.

Linked contracts

No related records observed.

Source

Find on CanadaBuys

CanPursue has no direct link to this notice. This opens a CanadaBuys search for its solicitation number.

Source
CanadaBuys
Solicitation
87055-17-0055
Observed
Sep 18, 2026

The amount, value range and contract duration shown on some CanadaBuys pages are not in the open data, so CanPursue does not show them.

Never miss an amendment

Track this opportunity in your pipeline and watchlists with a free account.

Create free account