CanPursue

Research

  • Search
  • Opportunities
  • Buyers
  • Suppliers
  • Contracts
  • Awards

Intelligence

  • OverviewAccount required
  • WatchlistsAccount required
  • PipelineAccount required
  • IntelligenceAccount required
Create free account

Sign in

⌘K
ENFR
Revised Research Project R563.1 – Evaluation of Probabilistic leak-before-break Methodologies for CANDU Pressure Tubes for the CNSC | Canadian Nuclear Safety Commission · CanPursue
Opportunities
Fit is part of the trial and paid plans.Closed

Revised Research Project R563.1 – Evaluation of Probabilistic leak-before-break Methodologies for CANDU Pressure Tubes for the CNSC

Canadian Nuclear Safety Commission87055-13-0260Federal
Find on CanadaBuysAdd to pipeline
Published
Jan 15, 2014
Respond by
Feb 24, 2014
Latest amendment
None

See how this opportunity fits your company

Create a free account and describe your company. With the trial, CanPursue checks every opportunity against it and explains the fit.

Create free account

Who won similar work

Create a free account to see past contracts like this one: who won and at what price.

Create free account

Description

The CANDU industry in Canada has successfully demonstrated LBB for pressure tubes using deterministic methodologies for decades; however, fracture toughness properties of the pressure tubes downgraded by an increase in hydrogen concentration challenges current assessments. The deterministic approach is supported by fracture mechanics methodologies with experimentally determined material toughness properties. Leak-Before-Break must be demonstrated for pressure tubes in operating CANDU reactors with hydrogen concentration above the terminal solid solubility of hydrogen dissolution at a sustained temperature. The primary concern is pressure tube failure from a volumetric flaw after crack initiation and subcritical crack growth by Delayed Hydride Cracking (DHC) at the operating temperature.

In response to assessed limitations in the current LBB approach, a new probabilistic LBB framework consisting of Level 1 and Level 2 methodologies has been proposed by the CANDU industry. Even though the probabilistic approach is permitted by CSA Standard N285.8-10, the probabilistic LBB methodology has yet to be accepted by the Canadian Nuclear Safety Commission. Similarly, other nuclear regulators have yet to accept the probabilistic LBB methodologies.

The objective of this project is to obtain an independent third-party assessment of the industry-proposed probabilistic leak-before-break Level 1 and Level 2 methodologies.

Procurement

Category
Services
Jurisdiction
Federal

Not stated in the notice: procurement type, procurement method, selection criteria, region of delivery, region of opportunity, expected contract period, end user

Requirements and qualifications

Supply arrangement
Not stated in the public notice
Security requirement
Not stated in the public notice
Trade agreements
—
Limited tendering reason
—

Classification

GSIN
—
UNSPSC
—

Amendments

No amendments observed.

Documents

No attachments listed in the open data.

Contact

No contact listed in the open data.

Related

More from this buyer

No related records observed.

Linked contracts

No related records observed.

Source

Find on CanadaBuys

CanPursue has no direct link to this notice. This opens a CanadaBuys search for its solicitation number.

Source
CanadaBuys
Solicitation
87055-13-0260
Observed
Sep 18, 2026

The amount, value range and contract duration shown on some CanadaBuys pages are not in the open data, so CanPursue does not show them.

Never miss an amendment

Track this opportunity in your pipeline and watchlists with a free account.

Create free account