Create free account5P468-24-0228/A Stage 2 - Rogers Pass Discovery Center Stabilization, Glacier National Park.
REQUIREMENT
Mount Revelstoke and Glacier National Parks requires a Contractor to execute a structural stabilization and envelope repair on the Rogers Pass Discovery Centre (RPDC).
The RPDC was completed in 1981 and has provided services adjacent to the summit of Rogers Pass between Revelstoke and Golden since opening. Structural deficiencies in the building threaten the structure and is required to be remediated to meet current structural code.
This scope of work will include the following general sequence of activities: • Remove the existing green roof system and replace with a lighter weight SBS roof system. • Complete structural upgrades to address lateral load instabilities, including improving load pathway design by re-enforcing shear walls and roof diaphragm. • Remove and repair damaged wood column bases that are rotten. • Install borate rods as a decay prevention measure on wood columns with minor water damage that are not being replaced. • Remove the cladding on the rear exterior wall and repair water damaged / wood rot areas and install a new water proofing membrane, weeping tile / drainage mat and new cladding. • Regrade around the exterior of the building to improve drainage away from the base of the building to mitigate water damage to exterior cladding. • Remove 2 existing customer service desks and replace with a single more functional and barrier
TWO STAGE SELECTION PROCESS
This posting is the Stage Two of a two-stage solicitation process: the first stage was to evaluate the qualifications of all interested suppliers. The second stage (Stage Two) is to invite the qualified suppliers to provide a financial bid on the project based on the specifications and drawings.
Only qualified suppliers have been invited to bid.
Not stated in the notice: procurement type, procurement method, selection criteria, region of delivery, region of opportunity, expected contract period, end user
The source reports 3 amendments. CanPursue observed 1 of them with dates.