Create a free account and describe your company. With the trial, CanPursue checks every opportunity against it and explains the fit.
Create free accountCreate a free account to see past contracts like this one: who won and at what price.
Create free account5P468-24-0219/A Stage 2 - 93N Ramparts Creek Culvert Replacement, Banff National Park
*** Only qualified suppliers have been invited to bid***
REQUIREMENT
Parks Canada requires a contractor to complete a culvert replacement at Ramparts Creek crossing at kilometer 87.9 on Highway 93 North in Banff National Park, AB. Scope of work includes but is not limited to: Design build and removal of a temporary detour and bridge, site isolation and design build of a temporary diversion channel, remove and dispose of an existing double Structural Plate Corrugated Steel Pipe (SPCSP) culvert (3900mm x 2600mm), supply and installation of a twin Precast Concrete Box Culvert (PCBC) (3355mm rise by 4575mm span), asphalt resurfacing and line painting, roadway structure rebuild, as well as riprap installation and rehabilitation of disturbed areas with topsoil and revegetation.
TWO STAGE SELECTION PROCESS
This posting is the Stage Two of a two-stage solicitation process: the first stage was to evaluate the qualifications of all interested suppliers. The second stage (Stage Two) is to invite the qualified suppliers to provide further qualifications and a financial bid on the project based on the specifications and drawings.
Not stated in the notice: procurement type, procurement method, selection criteria, region of delivery, region of opportunity, expected contract period, end user
No attachments listed in the open data.
No contact listed in the open data.