CanPursue

Research

  • Search
  • Opportunities
  • Buyers
  • Suppliers
  • Contracts
  • Awards

Intelligence

  • OverviewAccount required
  • WatchlistsAccount required
  • PipelineAccount required
  • IntelligenceAccount required
Create free account

Sign in

⌘K
ENFR
Tree removal, Major Upgrade of Highway 132 Forillon National Park – Phase III | Parks canada · CanPursue
Opportunities
Fit is part of the trial and paid plans.Closed

Tree removal, Major Upgrade of Highway 132 Forillon National Park – Phase III

Parks canada5P300-15-5880Federal
Find on CanadaBuysAdd to pipeline
Published
Mar 1, 2016
Respond by
Mar 15, 2016
Latest amendment
—2 amendments

See how this opportunity fits your company

Create a free account and describe your company. With the trial, CanPursue checks every opportunity against it and explains the fit.

Create free account

Who won similar work

Create a free account to see past contracts like this one: who won and at what price.

Create free account

Description

The Parks Canada Agency (PCA) Gaspé Management Unit wants tree removal work carried out as part of the major upgrade of Highway 132. The work involves felling trees on the new right-of-way of Highway 132 in the Castor trail sector and near Cap-des-Rosiers. Approximately 7.82 hectares are to be cleared. This estimate includes the right-of-way for a new electricity line. The tree removal areas and their dimensions have been marked on the plans by the firm Stantec, which are appended to this document. .1 Identify the tree removal areas and stake out the worksites in accordance with the plans provided by Stantec (4 plans, 158150010-300-ITD-ITD1-00 to 158150010-300-IT-D-ITD4-00). Files, in dwg format, will be provided to the company that is awarded the contract. .2 Over the entire tree removal area, fell the timber to ground or nearly ground level, including standing trees, scrub, bushes, roots, seedlings as well as partially buried logs, and remove the resulting material as well as all debris on the ground. If weather conditions do not permit razing to ground level, the cuts can be no more than 30 cm above ground. It will be expected of the contractor that he uses all means necessary to respect this requirement. In case of an important snow elevation, a high could be determined by the ministry representative. .3 This work can be done by a tracked multipurpose feller, a tracked feller-buncher, or by manual felling (chain saws). .4 Wood of commercial value felled within the corridor is the property of the Contractor, who can sell it. .5 The work includes no grubbing (stump grinding or root removal). .6 Trees must be felled so as to fall into the tree removal area. .7 Timber skidding must use a tracked vehicle or a vehicle with large flotation tires. .8 All tree removal debris must be removed from the park. .9 The logging or slashing debris can’t be left as is in the road right-of-way. If the Contractor chooses not to take out the debris of site, they need to be mechanically chipped as to obtain fragments of a maximum size to be incorporated to the organic soil or for any other use. (In accordance to the indications in the article “Forest fire prevention” in the CCDG)To dispose of tree removal waste, the Contractor may use shredders, provided that:

dimensions of fragments (wood chips) respect the indications in the article «Forest fire prevention» in the CCDG to get a maximum size to be incorporated to the organic soil or for any other use; fragments are spread evenly over the ground to a depth not more than 100 mm covering the natural terrain; no debris litters public or private roads or paths.

.10 The Contractor must take into account that there are watercourses (specially Cap-des-Rosiers stream, and #7 and #8 streams) in the tree removal area and that it must at no time allow its machinery to wade any watercourse. Temporary bridges will have to be built for the machinery to cross such watercourses. Machinery must never travel within 5 m of a watercourse. .11 At the end of every day, the Contractor must clean all its worksites. Once the work is completed, remove from the site all unneeded materials and equipment, including all waste and tools. The Brief documentation is in French. If you want an English copy, let us know we will have it translated. Bid security is required. Contractors must have $5,000,000.00 Liability Insurance Coverage.

Procurement

Category
Construction
Jurisdiction
Federal

Not stated in the notice: procurement type, procurement method, selection criteria, region of delivery, region of opportunity, expected contract period, end user

Requirements and qualifications

Supply arrangement
Not stated in the public notice
Security requirement
Not stated in the public notice
Trade agreements
—
Limited tendering reason
—

Classification

GSIN
—
UNSPSC
—

Amendments

The source reports 2 amendments. CanPursue observed 1 of them with dates.

  • Amendment 2Mar 4, 2016
  • Original noticeMar 1, 2016

Documents

No attachments listed in the open data.

Contact

No contact listed in the open data.

Related

More from this buyer

No related records observed.

Linked contracts

No related records observed.

Source

Find on CanadaBuys

CanPursue has no direct link to this notice. This opens a CanadaBuys search for its solicitation number.

Source
CanadaBuys
Solicitation
5P300-15-5880
Observed
Sep 18, 2026

The amount, value range and contract duration shown on some CanadaBuys pages are not in the open data, so CanPursue does not show them.

Never miss an amendment

Track this opportunity in your pipeline and watchlists with a free account.

Create free account