Create a free account and describe your company. With the trial, CanPursue checks every opportunity against it and explains the fit.
Create free accountCreate a free account to see past contracts like this one: who won and at what price.
Create free accountThe Work takes place on Sable Island and generally consists of the replacement of the existing water treatment components of the water supply system that provides water to the Main Station located on the island. The Work also includes the replacement of various electrical components, along with wiring to existing treatment system components. A floor drain in the building discharges directly underneath the building, near to the well itself; this drain is to be sealed, and the new system will drain to a new exfiltration trench to be constructed outside and away from the pumphouse. The well and water treatment equipment are located inside a concrete block building with slab on grade floor. A new connection to the treated water pipe outside the building will be made.
Not stated in the notice: procurement type, procurement method, selection criteria, region of delivery, region of opportunity, expected contract period, end user
The source reports 3 amendments. CanPursue observed 1 of them with dates.
No attachments listed in the open data.
No contact listed in the open data.