Create a free account and describe your company. With the trial, CanPursue checks every opportunity against it and explains the fit.
Create free accountCreate a free account to see past contracts like this one: who won and at what price.
Create free accountThe core of this project is to modify the existing power system of our mobile lab by designing and implementing a new power system to address issues inherent with the old system. The re-design should not include the existing inverters and integral battery charger. These should be replaced with a system that produces AC current for the loads continually from the DC BUS provided by the DC Power System, alternator, and batteries. That is, the completed system should work in a similar fashion to an online double conversion Uninterruptable Power Supply (UPS), providing the AC loads with uninterruptible frequency and voltage regulated AC power. Charging of the batteries must be included in the design.
Not stated in the notice: procurement type, procurement method, selection criteria, region of delivery, region of opportunity, expected contract period, end user
The source reports 4 amendments. CanPursue observed 1 of them with dates.
No attachments listed in the open data.
No contact listed in the open data.