CanPursue

Research

  • Search
  • Opportunities
  • Buyers
  • Suppliers
  • Contracts
  • Awards

Intelligence

  • OverviewAccount required
  • WatchlistsAccount required
  • PipelineAccount required
  • IntelligenceAccount required
Create free account

Sign in

⌘K
ENFR
Canadian Air and Precipitation Monitoring Network – Chalk River | Environment and Climate Change Canada · CanPursue
Opportunities
Fit is part of the trial and paid plans.Closed

Canadian Air and Precipitation Monitoring Network – Chalk River

Environment and Climate Change Canada5000077300Federal
Find on CanadaBuysAdd to pipeline
Published
Dec 13, 2023
Respond by
Jan 31, 2024
Latest amendment
—6 amendments

See how this opportunity fits your company

Create a free account and describe your company. With the trial, CanPursue checks every opportunity against it and explains the fit.

Create free account

Who won similar work

Create a free account to see past contracts like this one: who won and at what price.

Create free account

Description

1. Objective Environment and Climate Change Canada (ECCC) requires a Contractor for weekly technical support (1 day per week, 52 weeks per year) at the Canadian Air and Precipitation Monitoring Program (CAPMoN) Chalk River site located approximately 10 km northeast of Chalk River, Ontario with coordinates N 46.062417° latitude, W 77.404528° longitude.

2. Background ECCC operates an environmental research and monitoring station in the area which forms part of ECCC’s national network of CAPMoN stations. The primary focus of this monitoring station is the weekly collection of precipitation and/or air samples. Environmental data is collected from both automatic and manual samplers. A contract operator is required to attend to the station to retrieve and process the samples according to the CAPMoN Standard Operating Procedures (SOP's). The samples are then packaged and shipped for analysis to the CAPMoN National Laboratory located in Toronto, Ontario. Other weekly duties include reading and recording of various gauges, diagnostics, and regular servicing, troubleshooting, and minor repair of a variety of monitoring equipment. On-site training will be provided by ECCC technical staff.

3. Details of Work to be Performed

All sampling, shipping, and maintenance must be performed in accordance with the Site Operations Reference Manuals; and in accordance with any amendments to the aforementioned manuals. The routine may involve additional collectors, passive samplers and various climatological and meteorological instruments. ECCC will provide the Contractor the aforementioned manuals and amendments.

4. Tasks and Deliverables

Firm Requirement

1. The Contractor is responsible for servicing: a. Weekly Precipitation Collector, found at Appendix 1 to Annex A b. Weekly Air Filter Sampling System, found at Appendix 2 to Annex A

2. The Contractor must package and ship by courier to the designated laboratory as outlined in the measurement task appendices. The Contractor will be supplied with preprinted manifests and must ensure the samples are delivered to or picked up by the designated courier. Sample containers will be sent to the Contractor by the most economical means and may need to be picked up at the nearest Canada Post office. The Contractor is not responsible for shipping expenses.

3. First level maintenance, diagnosis of problems, and minor repairs to equipment is often required of the Contractor. This may include, but is not limited to: a. Cleaning of equipment b. Replacement of Defective parts c. Resetting or rebooting electronic systems d. Replacement and setup of operational unit with backup unit e. Checking and readjustment of various parts or software parameters as needed.

The Contractor is responsible for the physical shipping and receiving of replacement equipment as required.

4. The Contractor is responsible for some of the routine site maintenance including keeping the sample hut clean, clearing the snow off the sampling hut stairs and deck, and grass cutting to keep the vegetation within the fenced or designated compound area at an acceptable height. The general cleanliness of the immediate sampling location is the responsibility of the Contractor, including the removal of garbage/waste from the Site.

These tasks must be carried out in proximity of sensitive and expensive research and monitoring equipment and it is essential that the Contractor understand the need to avoid adverse effects on the measurements and data.

Optional Requirement

ECCC may require the Contractor to perform unforeseen work and emergency repairs on an as required basis.

Work must not commence until a duly signed Additional Work Authorization form (refer to Annex D) is completed by the Technical Authority and provided to the Contractor.

Procurement

Category
Services
Jurisdiction
Federal

Not stated in the notice: procurement type, procurement method, selection criteria, region of delivery, region of opportunity, expected contract period, end user

Requirements and qualifications

Supply arrangement
Not stated in the public notice
Security requirement
Not stated in the public notice
Trade agreements
—
Limited tendering reason
—

Classification

GSIN
—
UNSPSC
—

Amendments

The source reports 6 amendments. CanPursue observed 1 of them with dates.

  • Amendment 6Jan 31, 2024
  • Original noticeDec 13, 2023

Documents

No attachments listed in the open data.

Contact

No contact listed in the open data.

Related

More from this buyer

No related records observed.

Linked contracts

No related records observed.

Source

Find on CanadaBuys

CanPursue has no direct link to this notice. This opens a CanadaBuys search for its solicitation number.

Source
CanadaBuys
Solicitation
5000077300
Observed
Sep 27, 2026

The amount, value range and contract duration shown on some CanadaBuys pages are not in the open data, so CanPursue does not show them.

Never miss an amendment

Track this opportunity in your pipeline and watchlists with a free account.

Create free account