Create a free account and describe your company. With the trial, CanPursue checks every opportunity against it and explains the fit.
Create free accountCreate a free account to see past contracts like this one: who won and at what price.
Create free accountBackground:Environment and Climate Change Canada will be installing an automatic weather station at Fort Providence, NWT.We require that all bases have power and signal cable. All cable must be trenched in according to code. All power cable must be terminated appropriately.Environment and Climate Change Canada requires a main power line to be run and the connection to the electrical grid coordinated between the Contractor and power supplier.All work must be performed to the Canadian Electrical Code.The Technical Authority will be on site for all work.Objectives:100 amp (single phase) 120V service panel with a minimum of 12 breaker positions housed within appropriate enclosure. (actual requirement is 40 amp)Contractor to supply service panel, GFCI breakers, supply meter housing and appropriate disconnect switch.Teck connectors for panel for 2C12 cable supplied by ContractorPanel to be located behind Environment and Climate Change Canada main instrumentation box (L1,L2). Panel can be installed on same mounting poles or as required.Main power line to be run and be ready to connect to grid.Apply for all necessary permits with APPROPRIATE ENTITIES on ECCCs behalf.Coordinate connection to main power grid with appropriate utility company.Excavation and installation of concrete piles as in notes below.Trenching and cable installation as in notes below.
Not stated in the notice: procurement type, procurement method, selection criteria, region of delivery, region of opportunity, expected contract period, end user
No attachments listed in the open data.
No contact listed in the open data.