Create a free account and describe your company. With the trial, CanPursue checks every opportunity against it and explains the fit.
Create free accountCreate a free account to see past contracts like this one: who won and at what price.
Create free accountNOTICE Solicitation #5000046748 Electrical Motor Control Center (MCC) #8 Replacement Canada Centre for Inland Waters 867 Lakeshore Rd. Burlington, ON, L7S 1A1 SCOPE OF WORK Work to be completed under this contract involves the replacement of Electrical Motor Control Center (MCC) #8 located on the Administrative and Laboratory (A&L) building 3rd floor (Mechanical room). The replacement must be performed as per the specifications documents and drawings provided. The contractor must provide for all the required materials, equipment before/during/after installation and labour for installation, and manage the project requirements following the National Electrical Code. Project progress meetings are required at regular intervals with the owner, consultant, and the contractor, the specifics intervals will be determined in more detail at the “start-up” meeting but should be expected as often as weekly. Instruction and training to be given to Departmental Representative and Operating Personnel following successful commissioning of MCC 8. Further project details are contained in the project plans and specifications and must be reviewed in their entirety. All contractors intending to bid are requested to attend the mandatory site examination meeting. This will be the only opportunity to visit the site, examine the drawings and discuss projects details. The site visit will be held at the following date and location, as stated below: Interested bidders are invited to meet at Environment Canada, 867 Lakeshore Road, Burlington, Ontario on the 26th of September, 2019 at 10:00am. Failure to attend the “Site Visit” will result in bidder’s disqualification. IMPORTANT NOTE TO BIDDERS: Enquiries during the solicitation period shall be addressed only in writing by fax or email to the Contracting Authority named above and must be received no less than five (5) calendar days prior to the closing date stated above."
Not stated in the notice: procurement type, procurement method, selection criteria, region of delivery, region of opportunity, expected contract period, end user
The source reports 3 amendments. CanPursue observed 1 of them with dates.
No attachments listed in the open data.
No contact listed in the open data.