Create a free account and describe your company. With the trial, CanPursue checks every opportunity against it and explains the fit.
Create free accountCreate a free account to see past contracts like this one: who won and at what price.
Create free accountHighfield Dam, originally constructed in 1942, is located on Rush Lake Creek (NE 36-15-11 W3M) approximately 28km east of the City of Swift Current, SK; 10.4km south of the Hamlet of Rush Lake, SK; and, 8 km south of the TransCanada Highway. The dam creates a reservoir with a total storage of 14,895dam3 and flooded area of 517ha (at FSL). The basin upstream of the dam has a gross drainage area of 450 km2 and an effective drainage area of 372 km2. The components of the project include a 1040m long earthfill embankment, a 20m wide earthcut spillway around the west abutment, a low level outlet located near the west abutment of the embankment (West LLO) and a low level outlet located near the east abutment of the embankment (East LLO). The downstream water users include the Herbert and Rush Lake Irrigation Projects.
The work for this contract includes the provision of professional services to complete the final design, and construction oversight for the rehabilitation of the West Low Level Outlet. This includes general and specialized services during construction, project management services, environmental services and documentation as noted in this statement of work. Design and construction engineering for the remainder of the rehabilitation of the Highfield Project is not included in the scope of this service contract; these activities will be handled by a separate service contract.
Not stated in the notice: procurement type, procurement method, selection criteria, region of delivery, region of opportunity, expected contract period, end user
The source reports 2 amendments. CanPursue observed 1 of them with dates.
No attachments listed in the open data.
No contact listed in the open data.