Create a free account and describe your company. With the trial, CanPursue checks every opportunity against it and explains the fit.
Create free accountCreate a free account to see past contracts like this one: who won and at what price.
Create free accountThe work for the development of multi species artificial reefs in the Matane area includes, but is not limited to, transporting the concrete artificial reefs supplied by DFO and currently stored at the Béton Provincial Inc. plant in Matane; installing 190 concrete artificial reefs; raking and leveling the seabed prior to placing the concrete artificial reefs; and installing them using floating equipment adapted to the required water depths.
The work must be carried out with the participation of professional divers, and a survey must be performed using GPS to precisely locate the concrete artificial reefs and ensure that all 190 units are installed according to the coordinates shown on the plan. Following the contractor’s survey confirming the position of the artificial reefs and acceptance of the work by the Department’s representative, the latter will conduct a complete bathymetric survey of the site.
No later than 30 days after completion of the work, the contractor must prepare a post construction report including a description of the work method, photographs and videos taken during the transport and installation of the artificial reefs, and the survey results.
Not stated in the notice: procurement type, procurement method, selection criteria, region of delivery, region of opportunity, expected contract period, end user
The source reports 3 amendments. CanPursue observed 1 of them with dates.
No attachments listed in the open data.
No contact listed in the open data.