Create free accountWork under this Contract includes but is not limited to the provision of all labour, materials, and equipment required to:
• Design of four [4] site specific concrete foundations for towers supplied by Canadian Coast Guard (CCG); • Supply and installation of four [4] concrete foundations as approved by CCG; • Installation of CCG supplied towers as per CCG provided drawings; • Demolition of four [4] existing skeleton style towers and concrete foundations. CCG Sailors Encampment and Stribling Point range towers are at the end of their lifecycle and are required to be replaced. Three [3] of the four [4] sites are accessible by land/vehicle and one [1] site is accessible by boat or helicopter. The exact coordinates of the sites are as follows: • Sailors Encampment LL5414 front range tower : 46°15'39.54"N, 84° 5'51.12"W • Sailors Encampment LL5415 rear range tower: 46°15'58.85"N, 84° 5'42.66"W • Stribling Point LL5416 front range tower: 46°18'47.00"N, 84° 6'55.43"W • Stribling Point LL5417 rear range tower: 46°18'37.43"N, 84° 6'13.47"W Under this contract, a site specific concrete foundation shall be designed and stamped by a Professional Engineer practicing within the Province of Ontario. Geotechnical reports and tower drawings will all be provided by CCG to the Contractor to assist in the design the site specific foundations.
When the foundation design has been approved by CCG, the Contractor shall construct the foundations and erect CCG supplied ‘Quebec Towers’. Tower heights to be provided will be 40’, 45’, 70’, and 70’. Erection of the towers will also include the installation of their corresponding Daymarks. Daymarks will also be provided by CCG including the drawings of each Daymark to be installed. When new towers have been installed in their entirety, the Contractor shall then demolish the existing towers including their concrete foundations.
All enquiries must be submitted in writing to the Contracting Authority no later than seven (7) calendar days before the bid closing date. Enquiries received after that time may not be answered.
Work must be completed by February 28, 2025.
Not stated in the notice: procurement type, procurement method, selection criteria, region of delivery, region of opportunity, expected contract period, end user
The source reports 3 amendments. CanPursue observed 1 of them with dates.
No attachments listed in the open data.