Create a free account and describe your company. With the trial, CanPursue checks every opportunity against it and explains the fit.
Create free accountCreate a free account to see past contracts like this one: who won and at what price.
Create free accountThe work covered under this project at Anse-Bleue Harbour located in New-Brunswick, consists of the furnishing of all plant, labour, equipment and material for the electrical system upgrade. The work consists of but is not necessarily limited to the following; removal and disposal of all existing electrical equipment to accommodate the work unless indicated otherwise, arrange and pay allowance for NB Power to provide new service entrance in new electrical building as outlined on drawings and all other associated cost, complete construction of electrical building c/w electrical services and all devices and equipment, supply and install all underground trenching, wire and conduit, supply and install service to poles, shrouds and receptacles complete with associated equipment, new wood poles to replace those in poor condition, removal of existing wood poles and addition of new wood poles to correct excessive spans, new overhead wiring, new exterior lighting to replace and augment the existing NB Power owned fixtures, existing fixtures to be turned over to NB Power, new metal poles and lighting for approach to boat ramp, gangway, and for future gangway, wire and conduit, extend existing conduits as required, provide test and commissioning of all systems, existing electrical wires on wheel guard to be removed and turn over to the Administration Portuaire d’Anse-Bleue Contract includes mobilization and demobilization all equipment necessary to make work progress for the entire contract, including environmental controls and all associated items in strict accordance with specifications and accompanying drawings and subject to all terms and condition of this contract. Interim certificate (substantial completion) within 200 consecutive working days of award of contact date.
Not stated in the notice: procurement type, procurement method, selection criteria, region of delivery, region of opportunity, expected contract period, end user
The source reports 2 amendments. CanPursue observed 1 of them with dates.
No attachments listed in the open data.
No contact listed in the open data.