Create a free account and describe your company. With the trial, CanPursue checks every opportunity against it and explains the fit.
Create free accountCreate a free account to see past contracts like this one: who won and at what price.
Create free accountBACKGROUNDSCH owns a deteriorated ferry turning dolphin that is used by BC Ferries and the structure is at the end of its service life. This contract will be to remove and dispose the turning dolphin. BC Ferries are currently fabricating a new floating turning dolphin which they plan to install starting September 2022. Refer to site photos and additional details located in Appendix B - Reference Documents.NATURE OF WORKIn general, work consists of removing and disposing a deteriorated ferry turning dolphin. The existing turning dolphin is supported by approximately 51 steel piles, has a steel framed timber fender wall and a concrete topped platform. Any piles that are unable to be fully extracted from the subsurface shall be cut at the mudline. Float reconstruction may be required as per optional item 7.4. Refer to drawings for more details.
Not stated in the notice: procurement type, procurement method, selection criteria, region of delivery, region of opportunity, expected contract period, end user
The source reports 3 amendments. CanPursue observed 1 of them with dates.
No attachments listed in the open data.
No contact listed in the open data.