Create a free account and describe your company. With the trial, CanPursue checks every opportunity against it and explains the fit.
Create free accountCreate a free account to see past contracts like this one: who won and at what price.
Create free accountHazard mitigation work on a wreck in Jordan Harbour "The Grande Hermine"This requirement is for the Canadian Coast Guard, Department of Fisheries and Oceans Canada.Inquiries regarding this requirement are to be submitted to the contracting officer listed below:File Number: 4500013296 (30001095A)Contracting Officer: Ginette AliagaEmail: Ginette.AliagaGallo@dfo-mpo.gc.caObjectiveThe Canadian Coast Guard Central Region Vessel of Concern (VOC) program conducted a technical assessment of the vessel of concern located in Lincoln, ON in March 2021. During the assessment, it was determined by the Vessel of Concern program that the wreck posed a significant level of danger to the environment, as well as to the health, safety and well-being of the public. As a result of this assessment, it was deemed necessary to proceed with the removal of the main mast and to restrict access to the wreck to mitigate the hazards present.ContextThe Grande Hermine was reported as a vessel of potential concern in July 2019. An initial risk assessment was carried out in situ by two VOC program officers in order to validate the status of the VOC and to identify the following hazards;1) Easy access, which presents an issue for public health, safety and well-being;2) Deteriorated condition, which presents a risk of complete collapse of the superstructure;3) Finally, it represents a danger to the environment, being stranded in the port.___________________________________________________________1. Description of work1.1 Contractor shall remove all masts.1.1.1 The 3 masts and all parts attached to them including the mast that collapsed on the wheel house must be removed entirely using the necessary means to dismantle it from the water or from the shore. Identified in Appendix “A” of the Request for Proposal.1.1.2 All parts of the 3 masts, their contents and the surrounding debris including the mast that collapsed on the wheel house must be removed and disposed of in a center provided for this purpose.1.1.3 Masts shall be cut above the main deck.1.1.4 Mitigation measures shall be put in place to mitigate the risk to the environment.1.2 The contractor shall restrict and secure access to the wreckage by:1.2.1 Permanently securing the 3 different accesses to the wreck identified inAppendix A, pictures 2, 3 and 4.1.2.2 By welding steel plates to the structure to secure the various accesses identified in 1.2.1._____________________________________________________2. Submission and content of bidsThe deadline for receipt of bids is Tuesday, November 9, 2021 at 2:00 P.M. (EDT).3. DeliverablesAll deliverables required 4 weeks after contract award.LOCATION Located in Jordan Harbor off Queen Elizabeth Way in Lincoln approximately 25m from the shore.
Not stated in the notice: procurement type, procurement method, selection criteria, region of delivery, region of opportunity, expected contract period, end user
The source reports 2 amendments. CanPursue observed 1 of them with dates.
No attachments listed in the open data.
No contact listed in the open data.