Create a free account and describe your company. With the trial, CanPursue checks every opportunity against it and explains the fit.
Create free accountCreate a free account to see past contracts like this one: who won and at what price.
Create free accountThe overall objective of the project is to conduct an acoustic and mid-water fishing survey to better understand the acoustic signature of herring and of other species that overlap with Herring habitat.To achieve this goal, the proponent must perform the following:Allow DFO personnel to install and calibrate an EK80 echosounder system (equipped with 38 kHz, 70 kHz, 120 kHz, and 200 kHz transducers, hereafter referred to as a EK80 echosounder system) to be clamped to the wing-based stabilizer, unless one of these systems is already installed on the vessel;Be willing and able to operate and fish on a 24 hour schedule;Record acoustic data following a cruise track determined by DFO, and be willing to adjust vessel speed and other instruments whenever possible to ensure maximum quality of the acoustic data;Provide space at the bridge for a computer station for one DFO staff to facilitate communication with the fish master;Collect fish samples when aggregations are detected to validate the acoustic signal;Provide space on or below deck to process fish catches (e.g. sorting, weighting, measuring fish) after trawling operations;Follow a herring commercial vessel during night time acoustic survey at close distance (0.5 nmi) to allow for comparison between the acoustic and fish data collected by both vessels;Have at least two crew members assist DFO staff with identification, sorting, measuring, and weighting of catches;Follow the instructions given by the mission lead (scientist) and/or DFO staff onboard the fishing vessel.If needed, the echosounder will be installed and calibrated in a harbor equipped with a crane in New-Brunswick or Nova-Scotia where the Science team will meet with the vessel crew. The contractor should be present for these steps.
Not stated in the notice: procurement type, procurement method, selection criteria, region of delivery, region of opportunity, expected contract period, end user
No amendments observed.
No attachments listed in the open data.
No contact listed in the open data.