Fit is part of the trial and paid plans.Closed

Low Lift Intake – Screen Replacement and Commissioning of Chlorine Injection

The Correctional Service of Canada21450-25- 4623906Federal
Find on CanadaBuysAdd to pipeline
Published
Jan 22, 2024
Respond by
Feb 22, 2024
Latest amendment
—6 amendments

See how this opportunity fits your company

Create a free account and describe your company. With the trial, CanPursue checks every opportunity against it and explains the fit.

Create free account

Who won similar work

Create a free account to see past contracts like this one: who won and at what price.

Create free account

Description

Nature of Requirements: The following is a summary of the statement of work for this requirement. The Correctional Service of Canada (CSC) requires the services of a qualified contractor to replace the existing intake screen, provide a complete inspection of the intake line and chlorine feed line, repair existing shear in the piping and repair and commission the chlorine injection system at Joyceville Institution low lift intake.

Background The existing intake screen at the intake structure is in poor condition and requires replacement. A previous inspection and cleaning of the intake line uncovered a shear in the intake line pipe just outside the low lift building (approx. 5 m into the inspection) that is attributed to settling of the building. Accumulation of zebra mussels in the intake line has prompted the repair and /replacement of the chlorine injection system as a zebra mussel deterrent. CSC can provide the inspection report can be provided upon request.

Objectives: The Contractor must replace the existing intake screen, provide a complete inspection of the intake line and chlorine feed line, repair existing shear in the intake piping and repair and commission the chlorine injection system at the Joyceville Institution low lift intake.

Scope of Work: • Supply and replace intake line screen as per Specifications and Drawings. • Repair the break/ or shear in the intake line as per Specifications and Drawings. • Repair/ or replace the chlorine injection intake system and associated controls as a zebra mussel deterrent as per Specifications and Drawings. • Must provide full inspection of the chlorine injection system as per Specifications and Drawings. • Provide continuous water supply to the Institution for the duration of the construction as per Specifications and Drawings. • The Contractor must not begin any work that disrupts the operation of the Institution and Water Plant until all required materials and /supplies are on site. • Environmental Mitigation Measures Form – The Contractor must follow mitigation measures and best practices as per the Environmental Mitigation Measures Forms in compliance with the Impact Assessment Act (IAA) requirements. The Contractor must provide a detailed Construction Plan that outlines associated risks during construction and how the Contractor will mitigate those risks. The mitigation measures must be based on an understanding of Species at Risk in the Area. The Contractor must allow two (2) weeks for review of the Construction Plan. • All Work must meet Ministry of Environment, Conservation and Parks Design Guidelines for Drinking Water Systems (Ontario). • All work must meet applicable criteria outlined by Fisheries and Oceans Canada (DFO). • Detailed project requirements are found Annex E – Technical Specifications and Annex F – Engineered Drawings of the invitation to tender document:

Technical Specifications: o Request for Proposal (RFP) from consultant. o Section 01 30 00 – Mobilization/Demobilization. o Section 02 06 00 – Special Project Procedures for Correctional Service Canada Security Requirement. o Section 01 35 43 – Environmental Procedures. o Section 01 75 00 – Maintenance of Existing Flows. o Section 02 60 00 – Water Intake. o Section 15 42 00 – Chemical Feed Pump & Accessories.

Engineered Drawings: o W1 – P&ID, Pumphouse Plan & Section Upgrades. o W2 – Raw Water Intake Plan & Profile & Intake Screen Details.

Procurement

Category
Construction
Jurisdiction
Federal

Not stated in the notice: procurement type, procurement method, selection criteria, region of delivery, region of opportunity, expected contract period, end user

Requirements and qualifications

Supply arrangement
Not stated in the public notice
Security requirement
Not stated in the public notice
Trade agreements
—
Limited tendering reason
—

Classification

GSIN
—
UNSPSC
—

Amendments

The source reports 6 amendments. CanPursue observed 1 of them with dates.

  • Amendment 6Feb 22, 2024
  • Original noticeJan 22, 2024

Documents

No attachments listed in the open data.

Contact

No contact listed in the open data.

Related

More from this buyer

No related records observed.

Linked contracts

No related records observed.

Source

Find on CanadaBuys

CanPursue has no direct link to this notice. This opens a CanadaBuys search for its solicitation number.

Source
CanadaBuys
Solicitation
21450-25- 4623906
Observed
Sep 27, 2026

The amount, value range and contract duration shown on some CanadaBuys pages are not in the open data, so CanPursue does not show them.

Never miss an amendment

Track this opportunity in your pipeline and watchlists with a free account.

Create free account