⌘K
EN
FR
Rénovation des finis du CHSLD Pierre-Rémi-Narbonne | Government contract · CanPursue
Contracts
terminated
Rénovation des finis du CHSLD Pierre-Rémi-Narbonne
CISSS Montérégie-Ouest
Construction Michel Dubé inc (CMD)
19-168-AO-C
Watch
Total contract value
$425.5K
Original award value
$404.1K
Start
Aug 30, 2019
End
Feb 19, 2021
Timeline
Official
Awarded
Aug 30, 2019. Original award value: $404.1K
Amendment 1
Dec 13, 2019. MOD #01: Boites de jonction pour plinthes et luminaires temporaires ( pourcentage total : 2.06 %)
Amendment 2
Feb 5, 2020. MOD #03: Installation conducteur BX+ luminaire type F (ODC 05= -102.68$ CRÉDIT) + Remplacement luminaire discontinué (ODC 08= + 463.05$)
Amendment 3
Feb 5, 2020. MOD #02: Remplacement cache-siphon (ODC 07= 2952.13$ ) et Changement couleur protection murale (ODC 09= 1003.55 $) ( pourcentage total: 3.94 %)
Amendment 4
Jun 25, 2020. Modification no. 5 : ODC 15 et ODC 16 (travaux électriques) (+5,31%)
Amendment 5
Nov 7, 2019. Modification no. 4 : ODC 1 (enlever tablettes des garde-robes, matériaux contaminés, réparation des plinthes) (+4,61%)
Observed expiry
Feb 19, 2021