terminated
École John Rennie-Refection Interieure
La Commission scolaire Lester-B.-Pearson
Les Constructions P.R.V. Inc.
2102EG
Watch
Total contract value
$1.8M
Original award value
$1.6M
Start
Apr 26, 2022
End
Aug 18, 2023
Timeline
Official
Awarded
Apr 26, 2022. Original award value: $1.6M
Amendment 1
Oct 28, 2022. Lavabo CFER
Amendment 2
Jan 26, 2023. encastrer balance dans la dalle et installation des drains.
Amendment 3
Oct 28, 2022. Modification 15 fentres aile 200
Amendment 4
Oct 28, 2022. Ventillation aile 200
Amendment 5
Jan 26, 2023. ajout céramique toilettes aille 200
Amendment 6
Oct 28, 2022. Divers plomberie, ventilation et elec
Amendment 7
Oct 28, 2022. remplacement drain pluvial CFER
Amendment 8
Oct 28, 2022. enlevement 2eme rang de tuile aile 200
Amendment 9
Sep 18, 2023. ODC#19-mdifications a cause des travaxu gas et gypse suplementaire aile 200
Amendment 10
Oct 28, 2022. Calorifugeage extra aile 200
Amendment 11
Oct 28, 2022. Modification gaz local 286
Amendment 12
Oct 28, 2022. reparation dalle beton aile 200
Amendment 13
Sep 18, 2023. ODC#18-alarme incendie local 236B et modifications electriques CFER
Amendment 14
Oct 28, 2022. Data aille 200
Amendment 15
Oct 28, 2022. Evier EV-2 aile 200
Amendment 16
Sep 18, 2023. ODC#21-prolongation chantier et rangement
Amendment 17
Oct 28, 2022. aerotherme et event
Amendment 18
Sep 18, 2023. ODC#20-travaux hottes et plafonds local 486
Amendment 19
Oct 28, 2022. Plomberie 234
Amendment 20
Oct 28, 2022. Quincaillerie
Amendment 21
Apr 26, 2023. Valve de réduction de pression aille 200
Observed expiry