CanPursue

Research

  • Search
  • Opportunities
  • Buyers
  • Suppliers
  • Contracts
  • Awards

Intelligence

  • OverviewAccount required
  • WatchlistsAccount required
  • PipelineAccount required
  • IntelligenceAccount required
Create free account

Sign in

⌘K
ENFR
Project Management, detailed design, contract administration, and post-construction engineering services for storm and sanitary sewer and watermain improvements. • Main improvements include open-cut sewers • Improvements may also include outfall structures, inline/offline storage, channels, green infrastructure, enhanced grass swales, bioretention areas, etc. • Assignments may include road reconstruction works, watermains, sewer and water services, etc., as required. • Project management, including planning, coordination and monthly reporting. • Integration with the established Basement Flooding Protection Program Phase 4 program, and program management procedures. • Review of preliminary design prepared by others. • Modelling using InfoWorks ICM SE. • Performing geotechnical and hydrogeological investigations and producing geotechnical and hydrogeological investigation reports. • Performing subsurface utility engineering investigations and producing subsurface utility engineering reports • Tender preparation and tendering services. Page 2 of 2 • Construction contract administration and site inspection services, preparation and review of progress payments, change management. • Post-construction services. | Government contract · CanPursue
Contracts

Project Management, detailed design, contract administration, and post-construction engineering services for storm and sanitary sewer and watermain improvements. • Main improvements include open-cut sewers • Improvements may also include outfall structures, inline/offline storage, channels, green infrastructure, enhanced grass swales, bioretention areas, etc. • Assignments may include road reconstruction works, watermains, sewer and water services, etc., as required. • Project management, including planning, coordination and monthly reporting. • Integration with the established Basement Flooding Protection Program Phase 4 program, and program management procedures. • Review of preliminary design prepared by others. • Modelling using InfoWorks ICM SE. • Performing geotechnical and hydrogeological investigations and producing geotechnical and hydrogeological investigation reports. • Performing subsurface utility engineering investigations and producing subsurface utility engineering reports • Tender preparation and tendering services. Page 2 of 2 • Construction contract administration and site inspection services, preparation and review of progress payments, change management. • Post-construction services.

City of TorontoRV Anderson Associated Ltd.3751442529
Open official sourceWatch
Total contract value
$28.2M
Original award value
$28.2M
Start
Jul 11, 2023
End
—

Timeline

Official
  • AwardedJul 11, 2023. Original award value: $28.2M
Contract number
3751442529
Awarded
Jul 11, 2023
Instrument
—
Status
—
Amendments
0 amendments
Source
City of Toronto (Open official source)
3751442529
Related procurement
No linked procurement observed.