No award has been made at RFSQ stage. The Prequalified Parties will be invited to participate in the subsequent Request for Proposals (RFP) stage of this procurement process. The project involves bridge deck replacement, girder repairs and modifications, steel recoating, bearing replacements, and substructure bent rehabilitation on Gardiner Expressway from Grand Magazine Street to Spadina Avenue (Bent#91 to Bent# 145), including the following two (2) ramps - Gardiner westbound on-ramp from Spadina Avenue - Gardiner eastbound off-ramp to Spadina Avenue The rehabilitation will be realized through a Design-Build (DB) method of procurement, which will commence with a Request for Qualifications. The Project scope includes all design, construction, management, and other specialty services required to perform the work, including but not limited to the following: - Design and construction of deck replacement, girder repairs and modifications, steel recoating and bearing replacement. - Design and construction of necessary modification and rehabilitation of existing substructures, including patch repairs, refacing and galvanic corrosion protection. - Design, coordination, relocation, reinstatement, and upgrading of illumination, utility, signage, and traffic signals, RESCU, and associated electrical/power works. - Quality control during design and construction. - Traffic and construction staging and management. - All works related to replacements and upgrades to bridge drainage and associated storm water management infrastructure; and - Environmental and soil management measures. | Government contract · CanPursue
No award has been made at RFSQ stage. The Prequalified Parties will be invited to participate in the subsequent Request for Proposals (RFP) stage of this procurement process. The project involves bridge deck replacement, girder repairs and modifications, steel recoating, bearing replacements, and substructure bent rehabilitation on Gardiner Expressway from Grand Magazine Street to Spadina Avenue (Bent#91 to Bent# 145), including the following two (2) ramps - Gardiner westbound on-ramp from Spadina Avenue - Gardiner eastbound off-ramp to Spadina Avenue The rehabilitation will be realized through a Design-Build (DB) method of procurement, which will commence with a Request for Qualifications. The Project scope includes all design, construction, management, and other specialty services required to perform the work, including but not limited to the following: - Design and construction of deck replacement, girder repairs and modifications, steel recoating and bearing replacement. - Design and construction of necessary modification and rehabilitation of existing substructures, including patch repairs, refacing and galvanic corrosion protection. - Design, coordination, relocation, reinstatement, and upgrading of illumination, utility, signage, and traffic signals, RESCU, and associated electrical/power works. - Quality control during design and construction. - Traffic and construction staging and management. - All works related to replacements and upgrades to bridge drainage and associated storm water management infrastructure; and - Environmental and soil management measures.